Formwork laid out to apply a seal coating. |
First wall formwork about half complete. |
Pouring the wall. |
We ordered a 3500# mix with a slump of 5 with the intention to add some water to get the slump near 6, bit the 5 seemed to flow and vibrate fairly well. |
Finished wall after stripping the forms. |
Not to bad for our first time. Some bug holes, but overall I am satisfied with the results. |
Here is Dad working on forming the next wall to pour. |